Home Canada
  Solutions
Products
Where to find us
Support Services
Video Tutorials
News - Events
About Us   Canada
 
Solutions  
 
Cadastral
 
 
Engineering
 
 
 Sites
 
 
 HDS Workflows
 
 
 Roads
 
 
 Railways
 
 
  Automated 3D control for ballasting works
 
 
  High precision railway ballast construction
 
 
  Australian rail survey
 
 
  West Coast Main Line
 
 
  High Speed Railway
 
 
  Vancouver SkyTrain
 
 
  Vereina Tunnel - Switzerland
 
 
  Moving a railway bridge
 
 
  Tunnel profiles in subways
 
 
  Railway rapid transport
 
 
 Tunnel surveys
 
 
 Bridges
 
 
 Large Building Construction
 
 
 Airports and Stadiums
 
 
 Harbours and Docks
 
 
 Water Supplies
 
 
 Hydroelectric Power Plant
 
 
 Sewage collection
 
 
 Plants & Refineries
 
 
Monitoring
 
 
Building & Construction
 
 
Mining & Exploration
 
 
Asset & Facilities Mgmt
 
 
Aerospace
 
 
Automotive
 
 
General Industry
 
 
Forensics & Public Safety
 
 
Other
 

High precision railway ballast construction

Gradestar TPS machine control system
In early November 2003, the first fully
automated GradeStar-TPS 3D Dozer control
system in Europe was installed at the
Hydrex site in West Drayton, UK. The
GradeStar machine control system, based
on the robotic TPS1100 Total Stations
series, was installed on a Komatsu D41 P-
6 dozer together with Leica Geosystems
ProControl (the core 1D/2D/3D hydraulic
control system). This 3D machine control
system enables dozer operators to complete
grading work in a shorter amount of
time, more efficiently and with greater
accuracy.

Click to download High precision railway ballast construction (PDF, 103 KB) (PDF, 102.48 KB)
 
 
  Products
 
Leica Dozer 2000
Leica Dozer 2000  more